MIL-DTL-0048669A (AR)
5. PACKAGING
5.1 Packaging. For acquisition purposes, the packaging requirements shall be as
specified in the contract or order (see 6.2). When packaging of materiel is to be performed by
DOD or in-house contractor personnel, these personnel need to contact the responsible
packaging activity to ascertain requisite packaging requirements. Packaging requirements are
maintained by the Inventory Control Point's packaging activities within the Military Service or
Defense Agency, or within the military service's system commands. Packaging data retrieval is
available from the managing Military Department's or Defense Agency's automated packaging
files, CD-ROM products, or by contacting the responsible packaging activity.
6. NOTES
(This section contains information of a general or explanatory nature that may be helpful, but is
not mandatory.)
6.1 Intended use. The assemblies covered by this specification are intended for use with
the Cartridge, 40MM - M918 TP and the M550 Fuze. Additional requirements may exist
beyond those identified here for those individual applications.
6.2 Acquisition requirements. Acquisition documents should specify the following:
a. Title, number and date of this specification.
b. Title, number (w/revision level) and date of all reference documents.
c. ASSIST Online to be cited in the solicitation, and, if required, the specific issue
of individual documents referenced (see 2.2.1).
d. Requirements for submission of first article sample.
e. Requirement for submission of design verification sample
f. Certificate of conformance for each lot or shipment of product.
g. Packaging requirements, if other than specified in Section 5.
h. Quality Conformance Inspection, if other than specified in Section 4 of this
specification.
i. Provisions for critical characteristic controls.
j. Requirement for submission of inspection equipment designs.
k. Applicable National Stock number (NSN)
l. Serialization requirements, if applicable.
m. Government Furnished Material or Equipment.
n. Lists of drawings, publications and specifications, showing applicable revision
dates.
o. Critical inspection equipment requirement (see 6.6).
6.3 Drawings. Drawings listed in Section 2 of this specification under the heading US
Army Armament Research, Development and Engineering Center (ARDEC) may also include
drawings prepared by, and identified as Edgewood Arsenal, Frankford Arsenal, Rock Island
Arsenal, ARRADCOM drawings. Technical data originally prepared by these activities are
now under the cognizance of ARDEC.
6.4 Definitions.
18
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business