MIL-DTL-0050869F (AR)
-Before forming
25
-After forming
25
Actuator
8883760
25
Ogive
8886350
25
Body Fuze
8886356
25
Centerplate
9266693
25
O-Ring
9276672
25
Hammerweight Assembly
8864599
50
Escapement Assembly
8886357
125
Body Assembly
8886355
25
Centerplate Assembly
9266692
50
Fuze Assembly
8886360
158
4.3.2 Inspections to be performed. The first article inspection shall be 100%
examination for defects of all drawing characteristics (listed and unlisted) including
workmanship requirements for the parts and assemblies listed in 4.3.1 and tests specified in
Table II herein.
4.3.3 First article rejection. If any assembly, component or test specimen fails to comply
with any of the applicable requirements, the first article sample shall be rejected. The
Government reserves the right to terminate inspection upon any failure of an assembly,
component or test specimen to comply with any of the requirements.
6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business