
MIL-DTL-18714F (OS)
TABLE XXVII. Conformance inspection by classification of characteristics for primer electric, MK 45 MOD 1 assembly, drawing number
2434755 Continued
Conformance
Requirement
Inspection Method
Classification
Examination or Test
Criteria
Paragraph
Reference
Major
AIE
3.2
Level IV
M110
Note 12: The closing cup, find no. 7, shall be completely coated with type
B moisture proof varnish, find no. 8, and shall be expanded against inside
wall of the groove in tube. A bead of varnish shall be formed 360° around
the lip of the closing cup.
AIE
3.2 & 3.10
Level IV
M111
Note 13: Etch 13A and 13B information on surface, datum A. The
characters shall be .06 min size to a depth that is clearly and permanently
legible. Ammunition lot no. shall be in accordance with MIL-STD-1168.
(A)
Item nomenclature: MK 45 MOD 1 or MK 45-1.
(B) Ammunition lot number.
Note 15: The complete assembly shall have an electrical resistance of .10
AIE
3.2, 3.5 & 3.6
100%
to .18 ohms.
M112
21.363 +.000/-.089
AIE
3.2
Level IV
M113
Note 18: There shall be no varnish contamination or any foreign material on
AIE
3.2 & 3.10
Level IV
the electrode, insulator or stock.
M114
Note 4A: Stock and insulator assembly, with ignition element installed, shall
AIE
3.2
Level IV
be torqued to the primer tube, liner and plug assembly with 27±3 ft-lbs.
M115
Note 21: All primers must be radiographically inspected to satisfy
radiographic requirements of MIL-DTL-18714.
AIE
3.2 & 3.3
100%
M116
47
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business